Frocester Electrical, through main contractor EG Carter, have been awarded the contract for the installation of electrics into the prestigious new Stroud Brewery premises which are being built just 100 metres away from their current location. Keen to stay located in Thrupp and continue to be a valued facility for the local community, the company was fortunate to be able to buy a good sized piece of commercial waste land close by in 2017 and begin the construction process.
The brand-new building will cost £1.2 M and will accommodate the brewery’s growing needs, providing additional brewing capacity, storage facilities, larger offices, a new canal-side taproom with beautiful views of the Golden Valley and social/event spaces that can be rented. Frocester will undertake the electrical installation work to power up all these facilities. We look forward to enjoying a pint or two when the work is finished!